Operating Facts
Volume pumped, April 10, 1987 to June 30,
1989
Pumping Rate
One pump:
Two pumps:
Three pumps:- 1,350,000 gpm (3,000 cfs)
Pumps
Type: - Ingersoll-Rand vertical axis mixed flow.
Impeller:- 3 blades, 119 in.dia., 12,000 lbs.
Shaft: - 10.7 in. dia., 45.5 ft. long, 18,750 lbs.
Gear Drive
Weight:
Speed ratio:
Manufacturer:- Brad Foote Gear, Inc., Cicero, IL.
Engines
Dimensions:
- 27 ft. 11in. long, 11ft. 10 in. wide
- 17 ft.10 in. high, 16-cylinder 3,500 hp rating,
- 16.25 in. bore, 18 in. stroke
Weight:
- engine and skid - 162,800 lbs.
Manufacturer:
- Dresser-Rand, Painted Post, NY.
- A contract for procurement of pumps, gear drives
and engines was awarded to Ingersoll-Rand,
Painted Post, NY, for $7,829,378.68
Pumping Plant
Dimensions:- 110 ft. long, 55 ft. wide, 85 ft. high.
Engine deck elevation:
Sump bottom elevation:
Construction: Steel and reinforced concrete- (13,000 cu. yds. of reinforced concrete)
Contractor:- Layton Construction Co., Salt Lake City, UT
Engineer: - Eckhoff, Watson and Preator Engineering
- Morrrison-Knudsen Engineers,Inc.
Original bid:
Final cost:
Outlet Canal
Length:
Bottom elevation:- varies between 4207 to 4210
Bottom width:- varies between 75 to 100 ft.
Top width:- varies between 120 to 150 ft.
Operating depth:
Slope of canal:- avg. .18 ft. per 1,000 yds.
Material dredged:
Contractors:- Southern Pacific Transportation Co./Lost Dutchman, Inc.
Engineer:- Eckhoff, Watson and Preator Engineering
Access Road
Length:
Height:
Width:
Volume of fill:- 1.2 million cu. yds., Lakeside to Hogup
Bridges:- 4 (3 - 150 ft. long, 1 - 180 ft.long)
Contractor:- Southern Pacific Transportation Co.
- SPTC's contract included excavation of the
pumping plant foundation, excavation of the
Outlet canal, construction of four bridges,
reconstruction of the damaged 10-mile long causeway, and raising 25 miles of railroad track
for a total of $22, 980,000
Engineer:- Eckhoff, Watson and Preator Engineering
Bonneville Dike
Length:
Height:
Volume of fill:
Rip rap:
Contractor:- W. W. Clyde Construction, Springville, UT
Contract:
Newfoundland Dike
Length:
Height:
Volume of fill:
Rip rap:
Control weir:
Contractor:- Herm Hughes and Sons, Bountiful, UT
Contract:
|